Advanced structural strengthening, corrosion prevention, and concrete repair services for reinforced concrete structures in power plants and industrial towers.
The Problem
Cooling towers are exposed to continuous high humidity, thermal cycles, and chemical effects. Structural performance degradation begins after 15–20 years.
* Frequency of damage types encountered in industrial cooling towers (HUBYAPI database)
Methods
High-strength carbon fiber strips are bonded with epoxy resin. Improves capacity by 40–80% without adding weight.
Cracks are filled with high-pressure epoxy resin to restore original structural integrity.
Elastomeric coatings and penetrant silanes protect concrete against water/chloride for 20-30 years.
Reinforcement rusting is stopped with inhibitor coatings and cathodic protection systems.
Damaged concrete is removed and restored with polymer-modified repair mortars.
Schmidt hammer, ultrasonic pulse velocity, and endoscopic testing for comprehensive diagnosis.
Process
In-depth diagnostic report prepared with Schmidt hammer and carbonation depth tests.
CFRP backup or hybrid strengthening programs are designed based on diagnostic findings.
Work programs executed while facility remains active.
Every stage documented; comprehensive as-built reports delivered to the client.
Contact our engineering team for a free preliminary assessment. We examine the condition on-site.