Installation of a compact mechanical draft cooling tower park for a large chemical facility in Kocaeli Gebze.
The Marmara Chemical Facilities project covers the design, manufacturing, and commissioning of a multi-cell mechanical cooling tower system for a chemical factory located in the petrochemical park in Kocaeli Gebze. To meet the precise cooling requirements of chemical processes, 8 independent cooling cells were installed in a modular arrangement. All components were manufactured from FRP (fiber-reinforced plastic) and stainless steel to withstand the corrosive atmosphere of chemical plants. The system is equipped with a PLC-based smart control and remote monitoring infrastructure.